USGBC LEED-AP-BD-C Exam Syllabus Topics:

Topic Details
Topic 1
  • Sustainable Sites: It covers site assessment and planning that involves evaluating various site characteristics, such as topography, hydrology, climate, vegetation, and soil conditions. It also covers assessing a site’s potential as a resource for energy flows while addressing construction activity pollution prevention measures.
Topic 2
  • Location and Transportation: This topic measures the skills of LEED Green Associates in sustainable development. It addresses critical factors in site selection, including development constraints and opportunities related to environmental considerations, and community connectivity concepts, such as walkability and street design, which are vital for promoting sustainable transportation options.
Topic 3
  • Building Loads: This topic is focused on optimizing building performances through effective load management. It addresses design considerations such as building orientation and glazing selection while clarifying regional factors that influence these decisions.
Topic 4
  • LEED Process: This topic tests the skills of LEED Green Associates involved in green building initiatives. It focuses on various methods to achieve LEED goals, such as developing credit interpretation rulings and utilizing Regional Priority Credits to explore synergies within the LEED system.
Topic 5
  • Water Efficiency: This topic measures the skills of LEED Green Associates in optimizing water use in building projects. It explores strategies for reducing outdoor water use through efficient irrigation practices, including landscape water requirements and irrigation systems. It also covers using native and adaptive plant species to minimize irrigation demands.

 

Q58. During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

 
 
 
 

Q59. Which of the following could be considered diverted construction waste?

 
 
 
 

Q60. Which of the following will result in a higher demand for potable water use in irrigation?

 
 
 
 

Q61. A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?

 
 
 
 

Q62. Which of the following criteria does a project need to implement in order to qualify for Sustainable Sites Credit: Site Development – Protect or Restore Habitat, Option 1?

 
 
 
 

Q63. A neighborhood housing development organization has dual goals, promoting occupant’s health and minimizing energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization’s dual goals?

 
 
 
 

Q64. What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

 
 
 
 

Q65. When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

 
 
 
 

Q66. Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

 
 
 
 

Q67. The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.
What credits should the LEED AP suggest to meet this goal?

 
 
 
 

Q68. An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

 
 
 
 

Q69. The LEED AP is leading the first design charrette for a new LEED project with the project’s owners. What document should be used to record the project goals to be used throughout the design of the project?

 
 
 
 

Q70. Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

 
 
 
 

Q71. The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

 
 
 
 

Q72. Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building
90 degrees affects

 
 
 
 

Q73. A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of the following would be the best design approach?

 
 
 
 

Q74. A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

 
 
 
 

Q75. A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

 
 
 
 

Q76. The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

 
 
 
 

Q77. The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

 
 
 
 

Q78. An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?

 
 
 
 

Q79. To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

 
 
 
 

Real LEED-AP-BD-C Quesions Pass Certification Exams Easily: https://www.testbraindump.com/LEED-AP-BD-C-exam-prep.html

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below