C-TS422-2021 Dumps By Pros – 1st Attempt Guaranteed Success [Q31-Q52]

Rate this post

C-TS422-2021 Dumps By Pros – 1st Attempt Guaranteed Success

100% Guarantee Download C-TS422-2021 Exam Dumps PDF Q&A

SAP C-TS422-2021 Exam Syllabus Topics:

Topic Details
Topic 1
  • Explain planning evaluation concepts
  • SAP User Experience strategy
Topic 2
  • Identify repetitive manufacturing specific master data
  • Identify features for Good Manufacturing Practices (GMP)
Topic 3
  • Outline both motivation and background of SAP S
  • 4HANA
  • Select and apply planning strategies, use the planning table
Topic 4
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA
Topic 5
  • Explain and compare the different production methods in make-to-order
  • Outline production planning components and functions
Topic 6
  • Determine master data objects for process orders
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
Topic 7
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Capacity Planning in SAP S
  • 4HANA
Topic 8
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 9
  • Set up an order type, apply material staging and confirmation
  • Explain line load planning and confirmation

 

Q31. Which chart types does the tabular planning table provide in SAP S/4HANA

 
 
 
 

Q32. An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

 
 
 
 

Q33. In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

 
 
 
 

Q34. How can you achive a feasible production plan in case of capacity constraints?

 
 
 
 
 

Q35. You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

 
 
 
 

Q36. What happens to this dependent requirement when you convert the planned order into a production order?

 
 
 
 

Q37. Which time elements are part of a routing operation?

 
 
 
 
 

Q38. Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

 
 
 
 

Q39. How can you set up the supply source for the Kanban process in SAP S/4HANA?

 
 
 
 
 

Q40. You want to use capacity availability checks for production orders. Which settings have to be made for this?

 
 
 
 

Q41. What does it mean for the production planner when MRP works with infinite capacities?

 
 
 
 

Q42. For which categories can you define BOMs in SAP S/4HANA?

 
 
 
 

Q43. The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?

 
 
 
 

Q44. You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

 
 
 
 

Q45. Which mhetods are available for goods issue posting of material components for process orders?

 
 
 
 

Q46. What is the purpose of collective orders?

 
 
 
 

Q47. Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

 
 
 
 

Q48. When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

 
 
 
 

Q49. Which of the following elements does MRP take into account during net requirement calculation?

 
 
 
 

Q50. Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

 
 
 
 

Q51. Which of the following is valid sequence of the main activities in production order processing?

 
 
 
 

Q52. In the Schedule Production app which setting can you make for the planning strategy?

 
 
 
 
 

Earn Quick And Easy Success With C-TS422-2021 Dumps: https://www.testbraindump.com/C-TS422-2021-exam-prep.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below