CCM Sample Practice Exam Questions 2026 Updated Verified [Q37-Q51]

Rate this post

CCM Sample Practice Exam Questions 2026 Updated Verified

Exam Study Guide Free Practice Test LAST UPDATED CCM

Medical Professional CCM Exam Syllabus Topics:

Section Weight Objectives
Reimbursement Methods 12% – Coding and utilization review principles
– Financial resources and negotiation
– Payment and reimbursement methodologies
– Insurance principles and benefit structures
– Managed care and accountable care concepts
Healthcare Delivery Systems and Community Resources 10% – Community-based services and resources
– Continuum of care settings
– Healthcare policy and systems
– Interdisciplinary collaboration
Ethics, Legal, and Practice Standards 18% – Confidentiality and privacy
– Scope of practice and roles
– Advocacy and patient rights
– Professional ethics and conduct
– Legal and regulatory requirements
Quality and Outcomes Evaluation and Measurements 10% – Outcome measurement and analysis
– Cost-benefit and effectiveness analysis
– Performance improvement
– Accreditation and regulatory standards
– Data collection and reporting
Care Management 30% – Caseload assignment and selection criteria
– Age-specific care application
– Care coordination and collaboration
– Medication management
– Evidence-based case management models and tools
– Cost containment principles
– Client-centered care plan development
Psychosocial Concepts and Support Systems 20% – Behavioral change theories and models
– Cultural competence and diversity
– Mental health and substance use considerations
– Abuse and neglect recognition
– Family dynamics and support systems

 

QUESTION 37
Which one of the following statements is correct regarding the Provisional Sum under the FIDIC Red, Yellow, and Silver Books (edition 1999)?

 
 
 

QUESTION 38
Under the FIDIC Red Book (edition 2017), if the Contractor fails to comply with Site clearance obligation, what two options does the Employer have?
Choose all of the correct answers (multiple possibilities)

 
 
 
 

QUESTION 39
(Upon review of the revised programme, submitted by the Contractor, if the Engineer (under FIDIC Red or Yellow Books) or Employer (under FIDIC Silver Book) does not give a Notice of Non-Compliance within 14 days after receiving a revised programme, then… [complete the sentence, thereby considering FIDIC Red, Yellow, and Silver Books (edition 2017)]. (1 correct answer applies))

 
 
 
 

QUESTION 40
(Which two statements are correct for the FIDIC Red Book (edition 2017)?
Choose all of the correct answers (multiple possibilities).)

 
 
 
 

QUESTION 41
Applying FIDIC Silver Book (edition 1999), which one of the following elements shallnotform part of the time Programme/revised programme?

 
 
 
 

QUESTION 42
Under the FIDIC Construction Contract, which one of the following statements is correct?

 
 
 
 
 

QUESTION 43
The Employer has prepared a contract for a waste-to-energy project based on the FIDIC Yellow Book (edition
1999). You are preparing negotiations on behalf of one of the Subcontractors with the Contractor. The main Contractor will manage the design and build of the Works, whereby the Subcontractor will deliver critical systems regarding power generation and cooling. The Contractor intends to contract the main Contract back- to-back with the Subcontractor. In the proposed back-to-back subcontract, the following amendment is proposed through Particular Conditions:
“Sub-Clause 4.4. The following paragraph is added: The Subcontractor is required to scrutinize the Employer’s Requirements in a manner identical to the obligations of the Contractor as stated in Sub-Clause
5.1 of the Main Contract. The Subcontractor will indemnify and hold harmless (up to the maximum liability of the Subcontractor) the Contractor with regard to any error, fault or other defect found in the Employer’s Requirements, its items of reference or Contractor’s design of the Works for the scope part for which Subcontractor is contracted.” What is your advice to the Subcontractor (SC) in regard to entering this proposed subcontract?

 
 
 
 

QUESTION 44
(You are the Contract Manager for the Engineer in a highway project using FIDIC Red Book (edition 1999).
There is a Schedule of cost indexation included in the Contract. The project must be completed by 31 December of this year. If the Contractor fails to complete the Works by then, how will the adjustment of prices take place thereafter? (1 correct answer applies))

 
 
 
 

QUESTION 45
You are the Contract Manager of the Engineer in a hotel project. In May 2020, the Employer and the Contractor signed a Contract based on the FIDIC Yellow Book (edition 2017), as per which the Contractor will design and build a hotel project with Contract Price of 5,100,000 USD. The Time for Completion for this project is 12 months (May 2021). The Contract also named a nominated Subcontractor (as referred to in Sub- Clause 4.5) who provides mechanical, electrical, and plumbing services for the project (including the fire fighting system), which was accepted by the Contractor without any discussions.
The Project was delayed due to issues with the fire fighting system, and you issued the Taking-Over Certificate in June 2022.
The Employer sent a Notice of Claim to the Contractor on Delay Damages with a maximum value equal to
10% of Contract Price (510,000 USD). The Employer also gave a Notice to the Contractor stating that the Contractor has failed to submit the evidence of payment to the nominated Subcontractor as well as the reason for withholding payment to the nominated Subcontractor. Therefore, the Employer has paid the nominated Subcontractor directly the entire amount due, coming to 100,000 USD. The Employer intends to include this amount as a deduction in the Final Payment to the Contractor.
As Contract Manager of the Engineer, you are tasked to make a fair determination of the Notices of the Employer. In your ” Notice of the Engineer ‘ s determination ” , what is your determination for the deduction of the next Interim Payment to the Contractor in relation to the amount directly paid to the nominated Subcontractor?

 
 

QUESTION 46
(Under the FIDIC Red, Yellow, and Silver Books (edition 1999), which of the following entitlements of the Employer can result in a deduction of the Contract Price and Payment Certificates subject to Sub-Clause 2.5?
(2 correct answers apply))

 
 
 
 

QUESTION 47
(Which one of the following statements regarding FIDIC Golden Principles is correct?)

 
 
 
 

QUESTION 48
A new important feature of the FIDIC Yellow and Silver Books (edition 2017) is the inclusion of the default position that the Works or relevant part of the Works designed by the Contractor shall be fit for their ordinary purposes. Is this statement true or false?

 
 

QUESTION 49
Which one answer holds two statements that are both correct with regards to risks and key considerations regarding the Golden Principles?

 
 
 
 

QUESTION 50
You are the Contract Manager of the Employer for a Data Centre Project using the FIDIC Yellow Book (edition 2017). As a Contract Manager during the procurement stage, you are to explain the difference between Dispute Avoidance and Adjudication Board (DAAB) and other alternative dispute resolutions for this type of project. Which one of the following statements of its explanation is NOT correct?

 
 
 
 

QUESTION 51
(Which two answers show characteristics of Test on Completion or Test After Completion under the FIDIC Silver Book (edition 1999)?
Choose all of the correct answers (multiple possibilities).)

 
 
 
 

The New CCM 2026 Updated Verified Study Guides & Best Courses: https://www.testbraindump.com/CCM-exam-prep.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below