Q30. Examine these commands:
1. Execute “crscti stop cluster -all” as the grid user from one database server.
2. Execute “crscti stop cluster -all” as root from one database server.
3. Power off all network switches.
4. Execute “crscti stop cluster” as root from one database server.
5. Execute “crscti stop cluster” as the grid user from one database server.
6. Power off the rack using the power switches on the PDUs.
7. Execute “shutdown -h now” on all database servers.
8. Execute “shutdown -h now” on all Exadata storage servers.
Which is the correct order or the required commands to completely power off an Exadata Database Machine in an orderly fashion?

 
 
 
 
 

Q31. Which two activities are supported on the storage servers in an Exadata Database Machine?

 
 
 
 
 

Q32. Which four actions should you take before proceeding with applying updates to your Exadata Database Machine?

 
 
 
 
 
 

Q33. Which two activities are supported on the storage servers in an Exadata Database Machine?

 
 
 
 
 

Q34. You have been tasked with replacing a memory module of an Exadata Storage Server and need to power off the affected storage server. Which two commands must you execute to safely power off the storage server in an Exadata X9M Database Machine?

 
 
 
 
 
 

Q35. Which dbmcli command is NOT valid on Exadata X9M?

 
 
 
 

Q36. Which two options can be used to identify a damaged or failing flash card on an X9M-2 Database Machine High Capacity storage server?

 
 
 
 

Q37. Which are three customer options for hosting the Platinum Services Advanced Support Gateway?

 
 
 
 
 

Q38. For which four component failures on an X9M Database Machine does Auto Service Request (ASR) raise service requests?

 
 
 
 
 
 
 

Q39. Which two activities are supported on the storage servers in an Exadata Database Machine?

 
 
 
 
 

Q40. Which three of the following options are available for database consolidation on Exadata?

 
 
 
 
 
 

Q41. What is the minimum Oracle Linux version required to support RoCE and Persistent Memory?

 
 
 
 

Q42. A new Exadata Quarter Rack with 2 Database Servers and 3 HC Storage Servers and 3-phase 15kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU.
Which statement is correct?

 
 
 
 

Q43. You want to monitor how a large production table is accessed. Especially, you are interested to see how the access on that particular table leverages the benefits of the Exadata Platform.
Which two actions are NOT appropriate for that purpose?

 
 
 
 

Q44. You are updating your Exadata X9M-2 Elastic Database Machine with 6 database servers and 12 High Capacity Storage Servers. You will be using patchmgr to apply updates across the entire machine while still maintaining database availability.
Assuming you are driving patchmgr from an external server, which statement is true about the execution phase?

 
 
 
 

1z1-902 Premium Exam Engine – Download Free PDF Questions: https://www.testbraindump.com/1z1-902-exam-prep.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw fortunetelleroracle.com fortunetelleroracle.com www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below